We started more renovations this Spring. I just painted all the trim, the shelving unit in the Dining Room, and the front entrance. Isaac and Laine are outside finishing the deck that they started building just two days ago.
Here's what's on the menu for this year:
- Build (solar) air heater for shop
- Make Bathroom vanity
- Drywall and insulate Bathroom wall and ceiling
- Tile Bathroom floor (and possibly the hall and Laundry Room)
New (concrete) Bathroom countertop- Bathroom lights/fan
- New Bathroom fixtures: Bought, not ready to be installed
- Paint Bathroom
- Insulate upstairs Bathroom window
- Re-paint upstairs Bathroom door
- Fix upstairs hole near Bathroom
- Rip up Kitchen floor
- Replace Kitchen floor
- New Kitchen cabinets
- New (concrete) Kitchen countertop
- New Kitchen sink
- Relocate Kitchen light switches
- Paint Kitchen
Paint front hallwayPaint shelving unit in Dining Room- Paint upstairs shelving unit
- Paper/paint back hallway
Paint all upstairs trim- Paint all downstairs trim
- New hot water tank for tenants
- Insulate under addition
Install Natural Gas heating- New front door
- Paint front porch
Build back deck- Paint back deck
- Plant tree out front
- Build Addison's book shelf
- Build Addison's toy box
- Paint Spare room
- Paint Laundry Room
- New shelving unit for Laundry Room
- Sever lot for new house